Day 2 building the kitchen roof:
Wheel barrows Hauled up to 2nd floor: 14!
Mud: 10
Block: 4 (36 blocks in each wheelbarrow)
Wench pulls to 2nd floor:
14 wheelbarrows X 119 pulls = 1666 pulls!
Bricks placed: 144
Steps up ladder to 3rd floor:
With Block:
3 blocks each trip is 144/3 = 48 trips up ladder with block
With Mud:
8 buckets per wheelbarrow went upstairs X 10 wheel barrows of mud =
80 trips up ladder with mud
Total trips up the 10 foot ladder today: 128 trips
7 to 10 steps up the ladder X 128 trips = 1024 steps up the ladder.
Total person hours so far: 24 yesterday + 27 today = 51!
Total beers drunk to power the roof so far: 12 yesterday + 4 today (too tired to drink too much beer!) = 16
Kitty cats helping with construction: 0